Browse
···
Log in / Register
COST SPECIALIST – VALUATIONS AND WORKS PROGRAMMING, CIVIL ENGINEER, SANITARY
S/7,000-10,500/year
Indeed
Full-time
Onsite
No experience limit
No degree limit
La Vendimia 133, Lima 15049, Peru
Favourites
Share
Some content was automatically translatedView Original
Description

**EDUCATION:** * Degree holder and licensed professional in Electronic Engineering, Mechanical Engineering or Electrical Engineering. * Good physical condition and willingness to temporarily reside in southern Peru (project execution area). **EXPERIENCE:** * Minimum 3 years of specific experience in drinking water projects, sewage, treatment plants, pumping stations or hydraulic infrastructure. * Participation in the implementation of SCADA systems, telemetry and automation in sanitation works or related sectors (energy, mining, oil, etc.). * Experience in integration of sensors, instrumentation and actuators such as flow meters, pressure switches, automatic valves, frequency drives, among others. * Preparation of operation and maintenance manuals for control and telemetry systems. * Experience in commissioning and startup of SCADA systems in infrastructure projects. **SPECIFIC RESPONSIBILITIES:** * Develop and review project control, instrumentation and telecommunications drawings and diagrams. * Define technical specifications for sensors, PLCs, RTUs, control panels, communication equipment and SCADA systems. * Ensure installation complies with technical standards, approved drawings and safety protocols. * Configure and operate SCADA systems for remote monitoring and control of flows, pressures, reservoir levels, pumps and valves. * Verify calibration of sensors (level, flow, pressure, turbidity, pH, residual chlorine, etc.). **WE OFFER:** * Inclusion in payroll with all statutory benefits. * EPS covered at 25%. * Travel expenses covered at 100%. Job type: Full time Salary: S/.7,000.00 - S/.10,500.00 per month Ability to relocate/move: * Santiago de Surco 15038: Able to commute to work without issues or willing to relocate with a relocation assistance package provided by the company (Mandatory) Application question(s): * Advanced S10 Experience: * Sanitation works: 2 years (Required) Work location: On-site job

Source:  indeed View original post
María García
Indeed · HR

Company

Indeed
Cookie
Cookie Settings
Our Apps
Download
Download on the
APP Store
Download
Get it on
Google Play
© 2025 Servanan International Pte. Ltd.