···
Log in / Register
JUNIOR ENGINEER PRODUCTION ASSISTANT WITH EXPERIENCE IN LAST PLANNER SYSTEM METHODOLOGY
S/1,500/month
Indeed
Full-time
Onsite
No experience limit
No degree limit
Ctra. Panamericana Nte. 3778, Lima 15160, Peru
Favourites
New tab
Share
Some content was automatically translatedView Original
Description

* Licensed and registered Civil Engineer (MINIMUM 1 YEAR) * Essential experience in building projects using Last Planner System methodology * Minimum of (01\) year participating as Resident Assistant or Site Supervisor * Experience in construction projects (essential) Do not apply if you do not meet the requirements. Job type: Full-time Salary: S/.1,500\.00 \- S/.1,600\.00 per month Work location: On-site employment

Source:  indeed View original post
María García
Indeed · HR

Company

Indeed
Cookie
Cookie Settings
Our Apps
Download
Download on the
APP Store
Download
Get it on
Google Play
© 2025 Servanan International Pte. Ltd.